March 31, 2009

Spring Cometh...almost

Tuesday, March 31, 2009 Posted by Ryan , , , No comments
I did yard work 2 weekends in a row. Both times it rained. This Sunday it started snowing again. Just little bits, but after spending several hours in the rain digging dirt, moving rocks and transplanting bulbs, I wasn't going back out in the snow. So I didn't get the compost cage built yet but I have a big plastic bag full of yard waste just waiting to be composted. Last weekend I decided the grape arbors had to go. They were both falling down and really the vines were just out of control. Using only a small pair of clippers and a 2.5 lb sledge hammer (I found it faster than the hammer, which would have sufficed) I reduced everything to a pile of decrepit lattice and a separate pile of grape vine branches. I left the stumps in the ground because I don't want to completely remove the grapes, just redirect them. Hopefully the root system will use its energy to send up new suckers that I can train and control.

After spending some time in the back yard dismantling the grape arbor I realized that the roaming neighborhood dogs spend plenty of quality time in our yard over the winter. I don't remember it being as bad last year, but there was a lot of decomposing dog poo left when the snow melted. I realized that in order to keep our vegetable garden safe and "clean" the fence needs to go up now.

I've been putting off the fence project. 'Cause fences are big, and hard (well digging the holes in our rocky soil is hard) and procrastination is easy. But the fence is important and will allow us to use the back yard and grow things other than dead grass. I have plans. Plans that involve a lot of digging. Step 1: Build fence. Step 2: Plant Vegetable Garden.

February 19, 2009

We Have Laundry

Thursday, February 19, 2009 Posted by Ryan , , , , No comments
It took a while – over a year – but we can now do laundry in the house. I wanted everything to be in place before I bought a washer and dryer. Electrical, plumbing and venting all needed to be altered to install a working and safe laundry area. Hiring a plumber to re-do the drains was the biggest expense. It actually cost more than the washer and dryer, but after two days we have a new stand pipe with a p-trap to replace the old drum trap and a new drain extension off an existing 4” vertical drain for the upstairs bathroom. It was all the little expenses that added up to be not so little that surprised me though. $30 of stuff to vent the dryer, $50 to wire the dryer outlet, another $30 to wire the washer outlet plus new water shutoffs, and no-burst washer hoses and it was about $200 just to connect everything.

I decided to vent the dryer through a window – temporarily. The pane was already broken and it’s right above the dryer. Eventually I want to vent through the foundation wall and maybe replace the windows above the dryer since only one has hinges and can open. ( I could add hinges to the other one maybe, but 30” in-swinging casement windows in the basement seem like a hazard since they are all open at about face level – 5’.)

To install the new outlets – one for the washer and one for the dryer – I decided to run the wires through the ceiling instead of running 30’ of conduit and competing with the water supply lines for space. This meant that I had to drill a hole through each joist and pull the 12 and 10 gauge wire across the room 1 foot above my head. It took a little effort and a little help and with the additional help of the reciprocating saw we got the wires down the wall and to the new outlet locations. The lathe and plaster were already pretty damaged on that wall anyway so I’m okay with the mess I made of it. Someday I’ll take out that section and put up some nice smooth drywall. Someday…after the electrical in the rest of the house is replaced, after the water supply lines are replaced…you know, someday.

But for now I can wash the sheets, and blankets, and jeans, and t-shirts and delicates without trudging down the street and procrastinating for 6+ weeks. I’ll probably still procrastinate but at least when I get desperate I can do a load of socks and underwear.

No, No, Nanette opens tomorrow and we’ll run for 5 weekends but after that I’m taking a break - I think. I want to , but I want to do a lot of things. If I decide to stay at home for a while, I want to start getting seeds for the side of the house and the vegetable garden, pick out a rose and scrape/repaint a trellis to grow it on. I want to start work on a patio for the back yard and start the fence. Before you know it the snow will be gone and it will be spring and we can start taking real walks with Yoshi and spending time outside. Yup, I’m done with winter.

January 28, 2009

Last one down...

Wednesday, January 28, 2009 Posted by Ryan , No comments
Why is it that when I find a magazine I like it closes. First Budget Living, then Blueprint, and now Domino. So what happens now. When Budget Living closed we all just forfeited our subscriptions since it was an independent magazine. Martha gave us issues of Martha Stewart Living for the remainder of Blueprint subscriptions (and I'm getting Southern Accents? in lieu of Cottage Living). Conde Nast is a big publisher and no doubt we'll get something, but Domino was its only shelter mag (unless you count Architectural Digest which is in a totally different class).

At least there's still Sunset.

Katie, I'm sorry I keep getting you gift subscriptions to magazines mere issues before they close. I should have know this was happening when the rumors started flying.

January 23, 2009

Paying to get it done

Friday, January 23, 2009 Posted by Ryan , , , , 2 comments
So…it snowed a lot this last month (90+ inches), I finished the one show, Paul opened another, and I started rehearsals for a third. Oh, and I hired someone for the first time to do work on the house. After the last trip to the laundry mat with the 10 loads of laundry I realized that I wasn’t making any progress on getting us our own laundry set up. It’s been over a year and I just don’t have the time (and I’m not making the time to do it either). I asked around for recommendations, called a plumber and just had him do it. Actually, I looked at the estimate and said, “That’s a lot of money, how much of that could I do myself?” I decided to have the plumber just do the drains (which involved things like busting up concrete and cutting out sections of 80+ year old cast iron pipe – I didn’t want to mess that up) and I could do the water supply myself and install the sink.

It was still a lot of money to get the drains done by the plumber. I keep having this fantasy that when I get the bill it will be lower than the estimate because they got it done so fast. Right. I bit the bullet and finally ordered a washer and dryer and before they’re delivered I have to
1) replace the water shutoffs for the washer and move them 24” to the right.
2) redo 110v outlet for the washer (currently it has exposed romex and is near the ceiling).
3) move the 220v outlet from behind the refrigerator to behind the dryer.
4) install dryer vent in wall.
Later I still need to install my $3 laundry sink w/no legs and at the minimum make sure water from the super old laundry shut offs goes into the sink and not on the floor (they’re several inches past the edge of the sink location.)



The dryer outlet is where the red star is and the washer hookups are at the blue star. I'm sorry but I can't have the washer on one side of the basement and the dryer on the other; that isn't right. The square under the blue star? That's a 18" cube of concrete just hanging out in the basement. The new utility sink will go there using the washer water supply above, and the washer will use the water supply from the old sink under the windows.

I took pictures while I tore down and busted up the old concrete sink that I’ll post later. I had this crazy idea that I’d be able to put the sink in the backyard until I figured out what to do with it. After I got it down from the stand, I couldn’t move it 3 feet. Now I have three cardboard boxes full of busted concrete in the basement waiting for incremental disposal in my trash can.

Last weekend my dad helped me install a deadbolt in the basement door for the plumbers to gain access when we weren’t home (without giving them access to the whole house) and the hardest part of the whole thing is always getting everything lined up exactly. Because if it isn’t you can’t get both screws screwed in and it is so frustrating! Trying to put it together, take it apart, find a flashlight, get one lined up but loosen it to get the other in, now you can’t get the first screw to thread – and over and over until finally, magically it works and 10 seconds later your deadbolt is installed. It isn’t like I have any sense of false security with deadbolts since we have 100+ panes of glass in the house. Really I just needed key access from the outside and a deadbolt is easier than replacing the original mortise knob/lockset. Or I could start carrying around skeleton keys.

December 11, 2008

Curious about the Booze?

Thursday, December 11, 2008 Posted by Ryan , , , No comments
I wrote up a post about the potential of a new bar (tavern) in my neighborhood and the difficulties restaurants have had getting liquor permits in the past. But you have to go here to read it 'cause it's posted on the Spokane Food Blog.

November 11, 2008

Trying to pull things together

Tuesday, November 11, 2008 Posted by Ryan , , , 2 comments


So I've been wanting to replace the living room rug. It's a big rug, 8x10 and I'm not even sure I know what to look for in a rug. The point is, I found a rug that I like, I think I like? A rug that I'm second guessing myself on, but is a nice rug. It isn't girly and it's a nice neutral color. The urgency is that there are fewer than 48 left in the US (I know because the nice people at Pottery Barn can't order it for me and I have to pay the extra shipping to have it delivered to the house). But the price is right, and I can deal with the shipping cost (plus it will come right to the house and I don't have to figure out how to get an 8x10 rug in the daewoo). Do I just get the rug, do I wait for something "better"?

Rug: Braid Rug from Pottery Barn
Fabric (for drapes): Harmony (Spa) by Waverly
Sofa: Corona from Macys
Sconce: existing
Morris Chair: came with the house (needs to be recovered)
Paint: proposed color Glass Bottom Boat by Martha Stewart for Valspar

November 6, 2008

The Kitchen (as is)

Thursday, November 06, 2008 Posted by Ryan , , 1 comment

Although we've lived in the house a year now, the kitchen hasn't changed since we moved in. The new flooring went in a year ago and since then we've lived with the kitchen as is. Which means the cupboard doors are off since the doors had so much paint on them they didn't operate, the microwave sits on some old melamine shelves, the slide in range we bought to have a more built-in look just sits there with its unfinished sides exposed. The only functional prep space in the kitchen is actually the "custom" cupboard we built to fit first in our apartment and then retrofitted for the previous house and now it sits in front of the superfluous door that will soon be eliminated from the kitchen floor plan. There are just so many things that need to be done in the kitchen it was hard to get started. I bought a new sink and faucet last year, but can't install them until the counter tops are replaces, which can't happen until the existing lower cabinets are adjusted to accommodate a dishwasher (yea!) and of course there is always plumbing and electrical adjustments necessary for all this.

The new cabinets in the sketch above will go on the stove wall opposite the sink. There are no cabinets and no counter tops existing on that side of the room. When we moved in the stove and refrigerator were side by side in the space between two doors and the outlet for the refrigerator is located directly above the stove top (handy right?). The refrigerator was relocated to the basement and a new built-in undercounter fridge goes in the former breakfast area. I know some people couldn't live with the fridge in the basement, but it isn't very far, it doesn't hurt to have to go up and down a few stairs every day and it took up so much space (physically and visually).

The push for the kitchen right now is that my dad volunteered to make the new cabinets this week. This doesn't mean they will be done this week, but soon, and a lot sooner than they would be at the rate I was previously going. I took new measurements and designed the new cabinets to exactly match the existing ones. However the new base cabinets will have drawers instead of doors with full extension 100 lb drawer slides - so much more functional. I'm also matching the hardware to the existing but I'm a little torn over getting the really nice cast brass latches or the inexpensive pressed plated steel latches. The original latches are plated steel (and as such may need to be replaced also) so it's not like the originals were the top o' the line quality either. It's just the cost. The nice ones cost almost 5 times as much bringing the hardware cost for the upper cabinet to about $180. Uh, that's a lot right? It's all that brass that costs so much but brass doesn't rust which is nice for a kitchen.

The wood above is the countertops - american cherry butcher block. Due to cost and time they'll be coming from Lumber Liquidators and finished with Waterlox. Around the sink it will take six coats to properly protect the wood (six coats!) and four on on the other surfaces. Waterlox is a strong but renewable finish that offers more protection than mineral oil, but can be touched up, unlike polyurethanes.

So that's the plan anyway. I still have to figure out paint for the cabinets and walls, scrape and prep the cabinets (new and old), and figure out that plumbing/electrical stuff for the dishwasher (yea!). Can you tell I'm excited? I almost can't believe that we're on the way to having one room in the house "done." It's a start.